This project consisted of a new 328,000 square foot Hospital including:
- (134) Private Patient Rooms in the following nursing units
– Cardiac
– Orthopedics/Neurology and Rehabilitation
– Surgical and Oncology
– Medical and Pulmonary
– Intensive Care Unit
- 20-room Emergency Department
- Surgery Department including 6 Operating Rooms
- Imaging, including 2 CT Scanners and 1 MRI
- Women’s Center
- Rehabilitation Center
This project was one of the first full BIM projects completed in the Midwest by any construction team and Rock Hill was the Mechanical Contractor.
Key Project Elements:
- 100% AutoCAD MEP Prefabrication
- Coordination
- Dimension Based Hanger and System layout
- Multi Location Prefabrication – On Time delivery
- Duct: Supply, Return, Exhaust, Hazardous Exhaust, Grease Duct, Isolation Duct, Pharmacy Duct, Fume Hoods VAV & Air Valves, Black Iron, Galvanized, Stainless Steel and Aluminum Ductwork.
- Mechanical Piping: HHW, CHW, Gas, Cooling Tower Water, Steam, Fuel Oil, Condensate and Condenser Piping
- Plumbing: Storm, Sanitary, Domestic Water, and Specialties
- Medical Gas: O2, NCW, DI, CO2, VAC, N, MA, CA, N2O, WAGD, RO
- Prefabrication: Headwalls, Zone Valve Boxes, Flat Piping Racks
- (6) OR’s, (134) Patient Rooms, ICU’s, CT, MRI, Xray, Pharmacy, and ER
- AHU, Roof Top Units, Fan Coil Units, Blower Coils, Chillers, Energy Recovery, Cooling Towers, Boilers, Pumps, Humidifiers, Exhaust Fans, Relief Fans, Kitchen Exhaust Fans, Dishwasher Exhaust Fan, Elevator Exhaust Fan, Heat Exchangers, VAV’s, Tracking Boxes, Return VAV boxes, Air Valves, Instrument Air Compressors, Medical Air Compressors, Vacuum Pumps, Medical Gas Manifolds, Master and Area Alarm Panels, Medical Zone Valve Boxes and Med Gas Outlets, Fuel Oil Tank